(1) Basic requirements for construction:
Simply level the base cement (measured by 3m ruler ± 3mm), no obvious pits, drums; no waterproof treatment, ± 30 ° environment can be constructed.
Easy to install and disassemble, no glue is needed. It can be placed directly on a flat cement or asphalt floor, and the assembled floor is connected with a snap fastener (the tool is the best rubber hammer).
(two) scribing
The site is lined with special paint for the polypropylene top layer and does not fall off. The protruding part of the circular area can be painted with the same color as the main body with special paint of the same color.
(3) Sidebars
The thermal expansion and contraction coefficient of the interlocking wood indoor sport flooring basketball court is 2‰-3‰, so there must be a certain expansion and contraction zone around the site (about 5cm wide), which can be equipped with side strips according to the site area, and the side strip width is 5cm/ It is 25cm long and has a beautiful fixing effect.
(four) installation
Usually, four people can complete a standard basketball court pavement in less than eight hours.

detachable elastic flat PP mat sport flooring manufacturer
(5) Sports performance
The rebound rate is as high as 95%, and the sliding friction coefficient is 0.52, which is very close to the sports special wooden floor.
(6) Anti-skid design
It has a soft double cross-slip strip, which is non-slip and can transmit strong movement power as you like, preventing sports injuries such as sprains and bruises.
(7) color
The surface of the interlocking indoor sport surface of the basketball court is matte-treated, which is consistent with the brightness of the light. It does not absorb light and reflects glare, which can better protect the eyes and not cause fatigue.
(8) About basketball stand
The basketball stand area is reserved, and the basketball stand is placed on the ground without affecting the paving of the assembled floor.
(9) Thermal expansion and contraction
The thermal expansion and contraction coefficient of the assembled floor is 2‰-3‰. The expansion and contraction value does not cause the assembled floor and the ground to vacate in the up and down direction; in the left and right direction, the seams of the two assembled floors are not tight. Close together, but there is a certain gap, which ensures the expansion and contraction of every two assembled floors; plus the expansion and contraction area reserved around the site, enough to ensure the use of the entire site.
(10) Foundation problems
There are 676 effective support points at the bottom of each indoor sport surface interlocking tiles. On the one hand, it has good shock absorption and cushioning effect, on the other hand, it also makes the movement power evenly dispersed in all directions. In this way, if there are occasional small pits on the site, no matter where the pit is, it will not affect the balanced load of the assembled floor. If it is a very obvious pit, drum, it must be handled before construction.