Basketball court plastic suspension assembling sports floor installation construction process
19-06-12

The high-strength polypropylene environmental protection material used for indoor tennis court interlocking mat is one of the most mature environmentally friendly materials at present, and it can effectively solve the thorny problem of thermal expansion and contraction of the floor. At the same time, this environmentally-friendly material also has a stable surface friction stabilization function. Adding a UV-resistant solution to each floor can ensure that the floor does not fade during long-term exposure to sunlight, and the color of the suspended floor is bright and good at all times. The suspension structure design, together with the sturdy reinforced support foot structure, creates a high-quality vertical shock absorption effect. The non-slip surface can effectively prevent sports injuries. Good ball resilience and ball speed ensure the high-quality sports performance of the floor. It can be used to lay the ideal high-performance basketball court, tennis court, five-a-side football field, roller skating court, table tennis court and multi-purpose courts such as volleyball and badminton.
Basketball court suspension assembled floor display
The suspended basketball court assembled floor is the most used type of venue in life. Let's share the basic knowledge of the installation of the suspended basketball court.

Construction basic requirements

Simply level the base cement (measured by 3m ruler ± 3mm), no obvious pits, drums; no waterproof treatment, ± 30 ° C environment can be constructed. Easy to install and disassemble, no glue is needed. It can be directly placed on a flat cement or asphalt floor, and the assembled floor is connected by a buckle, which is fixed by a rubber hammer.

Second, the graphics line

The site is lined with a special paint for the polypropylene top layer and does not fall off. The protruding part of the circular area can be painted with the same color as the main body with a special paint of the same color.

interlock detachable synthesis elastic double tier sport flooring

Third, the edge banding

The thermal expansion and contraction coefficient of the assembled floor is 2‰-3‰, so there must be a certain expansion and contraction zone around the site (about 5cm wide), which can be equipped with side strips according to the site area, and the side strip width is 5cm/ It is 25cm long and has a beautiful fixing effect.

Fourth, the basketball court plastic floor installation time

Usually four people can complete a standard basketball court pavement in less than eight hours.

Five, sports performance

The ball rebound rate is as high as 95%, the sliding friction coefficient is 0.52, and the sports shock absorption rate is over 15%. The performance is very close to the wooden floor for sports events.

Six, anti-skid design

It has a soft double cross-slip strip, which is non-slip and can transmit strong movement power as you like, preventing sports injuries such as sprains and bruises.

Seven, color

The surface of the interlock commercial basketball court surface is matte-treated, which is consistent with the brightness of the light. It does not absorb light and reflects glare, which can better protect the eyes and not cause fatigue.

Eight, about basketball stand

The basketball stand area is reserved, and the basketball stand is placed on the ground without affecting the paving of the assembled floor.

Nine, thermal expansion and contraction

The thermal expansion and contraction coefficient of the assembled floor is 2‰-3‰, such a telescopic value, in the up and down direction, does not cause the assembled floor and the ground to vacate; in the left and right direction, the two basketball courts assemble the joints of the floor and It is not tightly attached, but there is a certain gap to ensure the expansion and contraction of every two assembled floors; plus the expansion and contraction area reserved around the site is enough to ensure the use of the entire site.

X. Foundation problems

There are 676 effective support points at the bottom of each sports assembly floor. On the one hand, it has a good shock absorption and cushioning effect, on the other hand, it also makes the movement power evenly dispersed in all directions. In this way, if there are occasional small pits on the site, no matter where the pit is, it will not affect the balanced load of the assembled floor. If it is a very obvious pit, drum, it must be handled before construction.